Gather the relevant records

For every stretch between the parcel and the public road, collect:

  • a plan identifying crossed parcels;
  • deeds recording any rights of way;
  • permitted uses and vehicles;
  • maintenance and repair arrangements;
  • agreements needed for timber storage or loading.

Inspect access as an operator would

On an authorised visit, record tight bends, narrow sections, bridges, ditches, wet areas and turning points. Photograph and locate obstacles. Ask the proposed contractor whether its equipment can operate, in which season and with what ground protection.

Read access and slope together. Illustrated woodland cutaway.
Read access and slope together.

Topography matters alongside visible tracks. On site, check working access, harvesting conditions and legal access rights.

Explanatory illustration · not a depiction of an analysed property

Connect slope to cost without an automatic discount

Steep ground can make operations harder. A suitable track and work plan can change the assessment. Compare extraction quotations for the same timber lot before translating terrain constraints into money. Report coefficients remain explicit assumptions.

Resolve unknowns before a firm offer

Keep missing rights, structures or agreements visible in the dossier. Ask the notaire and forestry professional which checks or conditions are needed. Never interpret an obstacle-free map as permission to enter.

Sources and dates

Figures retain their reference year. Worked examples are educational; property-specific amounts require verification.

Sources accessed 29 September 2026. Independent sources; no partnership implied.

This guide provides documentary context. For a binding decision, have field, legal or insurance issues checked by the relevant professional.