Managed in France · Sourced public data. Your woodland, clearly.
WoodWorth.
FR / ENAnalyse parcels

THE WOODLAND PROJECT GUIDE

A track on the map.
Access to establish.

A visible track establishes neither a right of way nor suitability for harvesting. Verify both before relying on access in a valuation.

Updated 29 September 2026 · France

A track on the map. Access to establish. — editorial illustration
Editorial illustration · not the property
The key point

Three questions: may I pass, with which vehicles and under what conditions? Slope alone cannot establish harvestability.

Gather the relevant records

For every stretch between the parcel and the public road, collect:

  • a plan identifying crossed parcels;
  • deeds recording any rights of way;
  • permitted uses and vehicles;
  • maintenance and repair arrangements;
  • agreements needed for timber storage or loading.
Read access and slope together. Illustrated woodland cutaway.
Read access and slope together.

Topography matters alongside visible tracks. On site, check working access, harvesting conditions and legal access rights.

Explanatory illustration · not a depiction of an analysed property

Inspect access as an operator would

On an authorised visit, record tight bends, narrow sections, bridges, ditches, wet areas and turning points. Photograph and locate obstacles. Ask the proposed contractor whether its equipment can operate, in which season and with what ground protection.

Connect slope to cost without an automatic discount

Steep ground can make operations harder. A suitable track and work plan can change the assessment. Compare extraction quotations for the same timber lot before translating terrain constraints into money. Report coefficients remain explicit assumptions.

Resolve unknowns before a firm offer

Keep missing rights, structures or agreements visible in the dossier. Ask the notaire and forestry professional which checks or conditions are needed. Never interpret an obstacle-free map as permission to enter.

Sources and dates

Accessed 29 September 2026. Independent sources; no partnership implied.